e84a138b43
1 Commits
Author | SHA1 | Message | Date | |
---|---|---|---|---|
b1dfdc4112 |
Configure Renovate (#1)
Welcome to [Renovate](https://github.com/renovatebot/renovate)! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin. ???? To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged. --- ### Detected Package Files * `.drone.yml` (droneci) * `requirements.txt` (pip_requirements) ### Configuration Summary Based on the default config's presets, Renovate will: - Start dependency updates only once this onboarding PR is merged - Enable Renovate Dependency Dashboard creation. - If Renovate detects semantic commits, it will use semantic commit type `fix` for dependencies and `chore` for all others. - Ignore `node_modules`, `bower_components`, `vendor` and various test/tests directories. - Autodetect whether to pin dependencies or maintain ranges. - Rate limit PR creation to a maximum of two per hour. - Limit to maximum 10 open PRs at any time. - Group known monorepo packages together. - Use curated list of recommended non-monorepo package groupings. - A collection of workarounds for known problems with packages. - If Renovate detects semantic commits, it will use semantic commit type `chore` for all commits. ???? Would you like to change the way Renovate is upgrading your dependencies? Simply edit the `renovate.json` in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs. --- You have configured Renovate to use the following baseBranches: `master`, `main`. ### What to Expect With your current configuration, Renovate will create 4 Pull Requests: <details> <summary>chore(deps): update dependency auto-py-to-exe to v2.33.0 (master)</summary> - Schedule: ["at any time"] - Branch name: `renovate/master-auto-py-to-exe-2-x` - Merge into: `master` - Upgrade [auto-py-to-exe](https://github.com/brentvollebregt/auto-py-to-exe) to `==2.33.0` </details> <details> <summary>chore(deps): update dependency beautifulsoup4 to ==4.12.* (master)</summary> - Schedule: ["at any time"] - Branch name: `renovate/master-beautifulsoup4-4-x` - Merge into: `master` - Upgrade beautifulsoup4 to `==4.12.*` </details> <details> <summary>chore(deps): update dependency pyinstaller to v5.9.0 (master)</summary> - Schedule: ["at any time"] - Branch name: `renovate/master-pyinstaller-5-x` - Merge into: `master` - Upgrade [pyinstaller](https://github.com/pyinstaller/pyinstaller) to `==5.9.0` </details> <details> <summary>chore(deps): update python docker tag to v3.11 (master)</summary> - Schedule: ["at any time"] - Branch name: `renovate/master-python-3-x` - Merge into: `master` - Upgrade python to `3.11` </details> <br /> ???? Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See docs for `prhourlylimit` for details. --- ❓ Got questions? Check out Renovate's [Docs](https://docs.renovatebot.com/), particularly the Getting Started section. If you need any further assistance then you can also [request help here](https://github.com/renovatebot/renovate/discussions). --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). Co-authored-by: Renovate Bot <no-reply@io-projects.com> Reviewed-on: #1 Co-authored-by: RenovateBot <renovate@noreply.endmove.eu> Co-committed-by: RenovateBot <renovate@noreply.endmove.eu> |